Two weeks have passed and with a one man demolition team, progress takes time. I started loading the trash trailer today. Yeah I know it's hard to tell which is which. LOL. But I can tell there is actually progress taking place. I was able to take 4 tractor loads of debris to the burn pile. It takes time to separate stuff that I want to burn and the stuff that I don't want to burn. The small stuff that I don't want to burn will be taken out in the regular trash cans. The bigger things will be loaded on the trash trailer and hauled to the dump. I was also able to tear down the second slide out and even remove the floor decking. I will continue demolition tomorrow.
Even though progress is not lightning quick, I am happy that there is visible progress and I know it will continue at a steady pace. I am still very enthusiastic about the Tiny House build :)
Even though progress is not lightning quick, I am happy that there is visible progress and I know it will continue at a steady pace. I am still very enthusiastic about the Tiny House build :)
The slide out has been torn down and the trash trailer (in the background) is getting loaded.